Embarcadero | completed in late 2019

Project Specs:

  • 1:2400 scale aerial imagery collection
  • Topographic mapping 1″ = 20′ scale and 1′ contours
  • DTM (digital terrain model)
  • 15′ orthophotography
  • 5 mile stretch of downtown San Francisco along piers (285 acre site)
  • 7 flight lines
  • VMR project timeline: 2 months 

 

Panoche Solar | completed in late 2019

Project Specs:

  • 1:7200 scale aerial imagery collection
  • Planimetric mapping 1″ = 100′ scale
  • 0.50′ orthophotography
  • 2400 acre site
  • VMR project timeline: 1 week

Worked closely with our client to ensure specific areas remained undisturbed for a protected species of lizard inhabiting the project site.

Reservoir LiDAR | completed in late 2019

Project Specs:

  • LiDAR collection (6.2 ppsm) and classified for bare earth
  • DEM (digital elevation model) with 1′ contours
  • Aerotriangulation for client supplied imagery
  • 0.25′ orthophotography
  • 5760 acre site (9 square miles)
  • VMR project timeline: 5 weeks

Valley Link | completed in Summer 2019

Project Specs:

  • 10 cm resolution aerial imagery collection
  • LiDAR collection (8 ppsm) and classified for bare earth
  • DEM (digital elevation model)
  • Topographic mapping 1″ = 100′ scale and 1′ contours
  • 0.50′ orthophotography
  • 40+ mile alignment (3400 acre site)
  • VMR project timeline: 7 weeks

Russel Gulch | completed Summer 2019

Project Specs:

  • UAS imagery collection
  • Topographic mapping 1″ = 100′ scale and 1′ contours
  • DTM (digital terrain model)
  • 0.15′ orthophotography
  • 38 acre site
  • VMR project timeline: 4 weeks

Willits Dam | completed summer 2019

Project Specs:

  • 10 cm resolution aerial imagery collection
  • Topographic mapping 1″ = 100′ scale and 2′ contours
  • DTM (digital terrain model)
  • 0.35′ orthophotography
  • 4530 acre site
  • VMR project timeline: 2 months

SoCal Valley Transportation Corridor | completed late 2018

Project Specs:

  • 5 cm resolution aerial imagery collection
  • Topographic mapping 1″ = 40′ scale and 1′ contours
  • DTM (digital terrain model)
  • 0.25′ orthophotography
  • 9.5 mile alignment (1900 acre site)
  • VMR project timeline: 2 months 